Who we place

Every discipline.
Every aircraft type.

We supply certified maintenance professionals across all specialisations, with approvals verified before every deployment.

B1 & B2 Licensed Engineers

Aircraft mechanics

NDT Level 2 technicians

Sheet metal workers (SMW)

Structural repair specialists

Painters & surface treatment

Borescope inspection (BSI) specialists

CAMO & technical managers

Quality & airworthiness staff

Contract types

Flexible to your operational model

Short-term & ad-hoc: sick leave, peaks, downtime gaps

Long-term contracts: sustained workforce solutions

Project-based: scheduled maintenance checks, hangar inductions

Schengen work & residence permit assistance available for non-EU professionals joining your team. We handle documentation, immigration coordination and the full compliance process end to end.

400+
Current contracts
administrated
5,000+
Candidates in our
database
48–72h
Deployment

Get started

Tell us your requirement

Describe your scope, aircraft type, location and required qualifications. We'll respond quickly with candidate availability and a tailored cost estimate.

Case study

Corrosion:
Frame 42 LH Fuselage, exceeding SRM limits

C-Check structural finding
— mobilised in 48 hours

Situation:
During a scheduled C-Check, structural corrosion on the lower fuselage skin panel (FR42–45) exceeded SRM limits. A structural repair was required before Return to Service — but no certified repair team was immediately available. Every day of delay risked cascading the entire hangar induction schedule.

What we did:
STAFFHUBAERO mobilised a certified structural repair team — including sheet metal specialists with all approvals verified and travel coordinated before departure.

Result:
Team on-site within 48 hours. Repair completed to SRM/OEM standards, aircraft returned to service on schedule. Induction slot protected.

Case study

Base maintenance check structural finding,
mobilised in 48 hours.

Corrosion: Frame 42 LH Fuselage, exceeding SRM limits

Situation:

During a scheduled maintenance check, structural corrosion on the lower fuselage lip skin panel (FR42–45) exceeded SRM limits. A structural repair was required before Return to Service but no certified repair team was immediately available. Every day of delay risked cascading the entire hangar induction schedule.

Solution & Result:

STAFFHUBAERO mobilised a certified structural repair team, including sheet metal specialists with all necessary experience verified and travel coordinated before departure.

Team on-site within 48 hours. Repair completed to SRM/OEM standards, aircraft released to service within TAT. Induction slot protected.

What our professionals say

From engineers on contract

Aleksandr
Zharnelkevich

B2 A320/B737 TEAM LEAD

POLAND

STAFFHUBAERO team provided comprehensive support in obtaining a residence permit and helped me secure a long-term contract with an excellent client who provided professional working conditions and a friendly team. Throughout our collaboration, which began in 2023, I am confident I will receive close support in any ongoing matters.

November 2025

Alexanders
Solomatovs

Structure/Interior Supervisor

LATVIA

I've had a great experience working with STAFFHUBAERO. The whole process was smooth from the beginning, and everything was organised at a very high level. Currently working on assignment at AirHub Aviation — clear communication, fast support, and no unnecessary complications. The team is professional, easy to work with, and always ready to help. Would absolutely recommend STAFFHUBAERO.

February 2026

Transparent pricing.
No surprises.
Rapid Deployment.

All-inclusive contract staffing with clear, open rates and no hidden costs at any stage.
Final price determined upon receipt of request.

Request A Team
avatars image
Get in touch
We'll get back to you as soon as possible.
Thank you! Our team will get in touch with you shortly!
Oops! Something went wrong while submitting the form.

Ready to mobilise?

Submit your request and our team will respond with specialist availability, estimated mobilisation timeline and a cost breakdown tailored to your scope.